Eicon Networks C21 Guia de Instalação Página 96

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 215
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 95
ECSNA: Monitoring SNA Resources 96
X.25/QLLC line to the remote host. Communications with the host will take
place only after a user initiates a connection from a workstation. Since the line
is not opened until it is required, line costs are reduced.
Using ECSNA
The following examples illustrate how to use ECSNA.
ECSNA START /N NODE1
Activates the node called NODE1 on port 1.
ECSNA STOP /N NODE1 4
Deactivates the Logical Unit 4 of NODE1.
ECSNA START /P 2 /N ORLANDO
Activates the node ORLANDO on port #2.
Vista de página 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 214 215

Comentários a estes Manuais

Sem comentários